Edmonton, Alberta, Canada(780) 555-0187

Project Portfolio

Our work speaks for itself

A selection of projects delivered across Alberta and Northeast BC, demonstrating the planning, field execution, and schedule discipline operators expect from Ironline.

Image placeholder

Selection board of field project documentation and industrial site imagery

Selected Work

Recent industrial work across active sites, shutdown windows, and field conditions

These project summaries are structured to show the kind of scope, pace, and accountability Ironline brings to Western Canadian operators.

01Project Case
Project image placeholder

Full crew during mechanical overhaul at gas processing facility

Gas Plant Turnaround — Edson, AB

Complete 21-day turnaround at a sweet gas processing facility. Scope included vessel inspections, piping replacements, valve overhauls, and instrumentation upgrades. 45-person crew, completed 2 days ahead of schedule.

21 days
45 crew
Completed early
02Project Case
Project image placeholder

Pipeline lowering-in operation across open terrain

16-inch Pipeline Replacement — Grande Prairie, AB

5.2 km pipeline replacement including tie-ins, hydrotesting, and reinstatement. Sour service environment requiring full H2S protocols.

5.2 km
Sour service
38 days
03Project Case
Project image placeholder

New compressor station under construction, structural steel phase

Compressor Station Construction — Fox Creek, AB

Greenfield compressor station build from foundations to commissioning. Civil, structural, mechanical, and piping scope were delivered under a single Ironline contract, giving the operator one accountable construction partner from first pour to final turnover.

Full build
6 months
Single source
04Project Case
Project image placeholder

Night-time emergency excavation and pipeline repair

Emergency Pipeline Repair — Whitecourt, AB

Emergency call-out for a pipeline leak requiring immediate excavation, cut-out, and sleeve repair. Crew mobilised within 4 hours. Repaired and returned to service within 18 hours of initial call.

4hr mobilisation
18hr total
24/7 response
05Project Case
Project image placeholder

Tank installation at expanded battery site

Battery Site Expansion — Drayton Valley, AB

Expansion of an existing battery site including two new storage tanks, pipe rack extension, and tie-in to existing facility. Completed during active operations with zero shutdowns required.

2 tanks
Live operations
Zero downtime
06Project Case
Project image placeholder

Routine maintenance crew performing valve replacements

Annual Maintenance Program — Multiple Sites, AB

Ongoing annual maintenance contract covering 12 well sites and 3 facilities. Scope includes valve replacements, piping repairs, painting, and general facility upkeep.

15 sites
Ongoing contract
Annual program

Next Case Study

Ready to add your project to this list?

Ironline supports operators with emergency response, planned shutdown scope, mechanical execution, and construction delivery built around real-world schedule demands.

Talk to Ironline